Projects
12 May 2025Refurbishment of the plant
The Bremen branch of G+H Isolierung was commissioned to renovate the acoustic ceilings, ventilation system and structural fire protection in the Bremen plant of a gas production company. Thanks to its expertise in the remediation of hazardous substances, the branch was also able to remove fire dampers containing asbestos. Our site manager managed all trades from a single source.
We placed particular emphasis on sustainability. The ventilation system and acoustic ceilings were renovated using environmentally friendly materials and technologies. The removal of the asbestos-containing fire dampers reduces pollutants and protects the health of employees and the environment. Our aim is to minimise the environmental impact and increase the efficiency and safety of the facilities through sustainable construction practices and modern technologies.
News