Noise Control
Noise protection hangar, Zurich Airport – Optimum reduction of engine noise
G+H constructed a new noise protection hangar on behalf of Zurich Airport to minimize the noise affecting the surrounding municipalities when conducting aircraft engine tests.
-
Fire protection
European Central Bank – Innovative fire protection system for the new ECB
Within the scope of the new building of the European Central Bank (ECB) in Frankfurt/Main, G+H Insulation was commissioned to install the PYROMENT®-IK90 system in escape and rescue routes.
-
Insulation
CB&I South Hook Terminal – Optimal LNG storage and processing
The low temperature insulation on two LNG modules of the CB&I South Hook Terminal in England ensures safe storage of the liquefied gas.
-
Insulation
E.ON Benelux – Support for outstanding energy efficiency
G+H has used a patented mounting system for vertical pipes to insulate more than 62,000 m² of pipe surfaces and vessels at the Maasvlakte Power Plant in Rotterdam.
-
Insulation
LNG Terminal – Cold insulation for best product quality
Within six months, G+H insulated the pipelines of three LNG tanks at the Gate („Gas Access To Europe“) terminal in Rotterdam, Netherlands.
-
Insulation
Trianel municipal utilities association – More power through insulation